• NEWS...
    • Our new factory get started...
      We started to produce in our new factory with is 7.500 m2 closed and 18.200 m2 open working area.

      02.01.2011
    • Koray - Zorlu Project is rising-up.
      Koray - Zorlu Levent Office/Trade Center is rising-up.

      15.02.2012
    • Tekpol Poliüretan is near to end
      Tekpol Poliretan, is near to completed with all dekoration works.

      16.02.2012
    • GOSB AVM Shopping Center is near to the end.
      GOSB AVM Shopping Center,from base to roof is near to the end.

      14.02.2012
        
  • GOOD WORDS...
    • Steel is a construction material and we use it to construct the future.
    • Steel is our profession not hoby.
    • No load is heavier than our feeling of responsibility
    • Education is richness that follows its owner.
      (Chinese Proverb)
    • Experience is the best, but most expensive way to learn.
    • Be as you look like or look like as you are.
    • Our succes is our business quality and its approval by our customers.
    • Our aim is highest possible quality in the current system.
        

History


2011 : We started to work in our new Factory, at Sakarya 3. OSB.

2010: We built our factory which has the 7.500 m2 closed area over 18.195 m2 area.

2009 : We completed many big projects, such as Sinan Erdem Sport Halls (Basketball hall with 15.000-seater, 2.700 Ton steel is used.), and MİGROS Erzurum East Anatolian Logistic Warehouse (Turnkey, 16.000 m2 closed area over 30.000 m2 area)

2008 : We bought our factory land.

2007 : We built the Metrobus Ring at TOPKAPI in ISTANBUL.

2004 : We moved our factory to the factory which has 2.200 m2 closed area, over 6.000 m2.

1993 : We found the CAGLA ENGINEERING & ARCHITECTURING INC.